The Powerwall Died Three Days Before the PSPS Shutoff. Your Portal Logged the Drift for Six Weeks.
The unplanned failure that costs a solar installer most, the signals that precede it in Enphase and Powerwall data, and arithmetic on 1,800 warranty systems.